We build the future
together.

Our projects.

List of significant projects.

2013.
LIST OF SIGNIFICANT PROJECTS ON WHICH OUR DESIGNERS WERE WORKING ON.
BUILDINGINVESTOR YEAR

YEAR

  
2010.
Residential and commercial buildingPrivate investor April 2010.
Production hall IITron d.o.o.June 2010.
Nursing home DvorNursing home, SisakNovember 2010.
Compost production plant with accompanying contentEuro-compost d.o.o.October 2010.
Poultry houses for poultry breeding in Slavonski KobašVindija d.dDecember 2010.
Poultry houses for turkey breeding in BanovciVindija d.dOctober 2010.
Fotball stadiumMunicipality of Primorski DolacNovember 2010.
  
2011.
Biogas plant Osilovac 999 KwOsilovac d.o.o.February 2011.
Jagodnjak Water Tower – VTV 200/31 m3Vodoopskrba d.o.o.August 2011.
HŽ Infrastructure Maintenance Workshop JurdaniHŽ Infrastructure d.o.o.November 2011.
Channel at the border k.o. Vrpolje – StrizivojnaStrizivojna Hrast  d.o.o.July 2011.
Daily consumer goods store with ancillary and business premisesStolar d.o.o. July 2011.
HEW Ivanec – business buildingHEW Ivanec d.o.o.November 2011.
Water Tower KabalKomunalac Vrbovec d.o.o.November 2011.
  
2012.
Biogas plant 1Bionarda Vrbanja 1 d.o.o.February 2012.
Freestanding steel chimney, H=24 m, Æ750 mmKIV d.d.June 2012.
Rehabilitation of the steel structure of Pavilion 8 at the Zagreb FairZagrebački Holding d.o.o.February 2012.
MBTS 10(20)/0,4 KV Colosseum city center Brod – three typical buildingsElektra Slavonski BrodAugust 2012.
Compensator – industrial buildingĐĐ KompezatoriApril 2012.
Ferrybridge – energy building, UKĐĐ TEP October 2012.
Compensator 5,3 x 3,3 mĐĐ KompezatoriLipanj 2012.
Poultry Farm DeloviVindija d.dOctober 2013.
  December 2013.
Outbuilding – PeradnjakKoka d.d.December 2013.

Luzern – energy building

 
Ikona Potvrdila zajednica
 
ĐĐ TEPOctober 2013.
Antenna pole ACS 39 – RovinjHrvatski Telekom d.d.February 2013.
Greenhouse for school practicumM.A.Reljkovića School, Slavonski BrodFebruary 2013.
Ridham Docks – energy buildingĐĐ TEPApril 2013.
Grain floor storageEuro-tim d.o.o.October 2013.
Static calculation of air ducts and  auxiliary construction for TE-TO ZagrebĐĐ TEPOctober 2013.
  
2014.
Anntena pole ACS 44/39Hrvatski Telekom d.d.March 2014.
Garage and workshop – carpentry and upholderySava d.o.o.June 2014.
Anntena pole ACS 44Hrvatski Telekom d.d.June 2014.
Water supply network on a poultry farm in SelnaVindon d.o.o.July 2014.
Linkoping – energy buildingĐĐ TEPApril 2014.
Amager – energy building, ŠvedskaĐĐ TEPApril 2014.
Severnside – energy building, UKĐĐ TEPOctober 2014.
MBTS 10(20)/0,4 kV “Panagra” Stari PerkovciElektra Slavonski BrodMay 2014.
Garage and workshop – carpentry and upholdery – removingSava d.o.o.June 2014.
TS 10(20)/0,4 kV “Pomerio”Elektra RijekaSeptember 2014.
Ground floor outbuilding – production of liquid for e-cigaretesELDA d.o.o. Nova GradiškaNovember 2014.
TS DTS 10(20)/0,4 kV „Grubišno Polje”Elektra KrižNovember 2014.
Benesse Maremne – energy building, FrancuskaĐĐ TEPDecember 2014.
10(20) kV Cabel transmition line I 10(20)/0,4 kV KTS „Dubrava 8 – Zagrebačka“Elektra KrižDecember 2014.
10(20) kV Cabel transmition line I 10(20)/0,4 kV KTS „Križ 8 – business“Elektra KrižDecember 2014.
Reconstruction of a part of low voltage network STS 10(20)/0,4 kV Gornja Gračenica 3Elektra KrižDecember 2014.
  
2015.
Antenna tube pole ACS 39 with central spikeHrvatski Telekom d.d.May 2015.
Substation TS 20/0,4 KV “Crnika”Hrvatska elektroprivreda d. d.March 2015.
Infrastructure building – antenna receiverHrvatski Telekom d.d.March 2015.
Broiler farm capacity of 176 UGMultivita d.o.o.November 2015.
Canopy of the tribune of the Homeland War Memorial Center in VukovarHomeland War Memorial Center in VukovarSeptember2015.
Antenna receivers at the existing borders Hrvatski Telekom d.d.December  2015.
Cogeneration plant based on wood biomass combustion, SpačvaD.I. Spačva d.d.May 2015.
Dublin WTE project – energy building, IrskaĐĐ TEPDecember 2015.
10(20) kV Cabel transmission line  I 10(20)/0,4 kV KTS „Novoselec 9 – HŽ“Elektra KrižJanuary 2015.
10(20) kV Cabel transmission line I 10(20)/0,4 kV KTS „Kutina 75 – HŽ“Elektra KrižJanuary 2015.
Cogeneration plant based on wood biomass combustion, LipovljaniLipovljani Lignum d.o.oAugust 2015.
Cogeneration plant based on wood biomass combustion, KaštelanecBioenergija Lipovljani d.o.o.September 2015.
Apartment building, Brodski StupnikPrivate investorNovember 2015.
  
2016.
Outbuilding – turkey fattening farm Brodski StupnikVindon d.o.o.February 2016.
Reconstruction of the existing gas station, Novi VarošPower Petrol d.o.o.August 2016.
Central warehouse – Food industry, SlatinaMarinada d.o.o.March 2016.
Compensator – industrial constructionĐĐ KompenzatoriJanuary 2016
Apartment building, Zaton – ŠibenikPrivate investorAugust 2016.
Veneer knife base – wood industrySlavonija DIJune 2016.
Rehabilitation of the Svilno viaductSitolor d.o.o.September 2016.
Cogeneration plant based on wood biomass combustion  5MW, Smiljan – GospićEnergana Gospić 1 d.o.o.November 2016.
Dunbar – energy buildingĐĐ TEPDecember 2016.
  
2017.
Residential and auxiliary building – PrimoštenPrivate investorJune  2017.
Residential building (P+2) – RogoznicaPrivate investorJune 2017.
Residential (P+1) and auxiliary building (P) with pool – PrimoštenPrivate investorNovember 2017.
Construction of a turkey fattening farm in  TrnjaniVindon d.o.o.October 2017.
Construction of a macadam rode and extension of the water and gas networkVindon d.o.o.December 2017.
Charleroi – energy building ĐĐ TEPJanuary 2017.
Erdut Water TowerVodovod Osijek d.o.o.March 2017.
Receipt of raw materials and shipping of the finished product – warehouseDecospan Mato furnir d.o.o.June 2017.
  
2018.
Residential (P+1) and auxiliary (P) building – PrimoštenPrivate investorMarch 2018.
Turkey fattening farm in Brodski Stupnik – upgradeVindon d.o.o.January 2018.
Auxiliary building – Garage and canopyPrivate investorJanuary 2018.
Apartment building (S+Pr+1) – BilicePrivate investorApril 2018.
University campus “Palacin”Polytechnic of ŠibenikuJune 2018.
Radio center Sjeverni Jadran – GuslicaCroatian air navigation control September 2018.
Upgrade of the economic – agricultural building – CanopysZlatko Šimić, PožegaAugust 2018.
Production building  – production of pyrotechnics, VrbovecPirotehnika Mirnovec d.o.o.February 2018.
Production building – carpentry workshop, Stari SlatnikStolarija RendulaMarch 2018.
  
2019.
Residential building K2, K3 i K4 – SrimaPrivate investorApril 2019.
Residential family house – GrebašticaPrivate investorFebruary 2019.
Residential and commercial building – GrebašticaPrivate investorFebruary 2019.
Antenna pole Petrova GoraOdašiljači i veze d.o.o.August 2019.
Nursing Home StadlerThe Society of the Sisters of the Servant of the Little Jesus October 2019.
Commercial building – Tasting buildingZlatko Šimić, PožegaJuly 2019.
Sv. Ivan Žabno Water TowerVodne usluge d.o.o., KriževciApril 2019.
Apartment building “K1-2SJ” (Po+Pr+1), Srima – VodicePrivate investorDecember 2019.
Business building for car sales and body shopPrivate investorMarch 2019.
Cogeneration plant based on wood biomass combustion, VrpoljeBioenergetika d.o.o.April 2019.
  
2020.
Home for the Elderly and a center for the provision of non- institutional social services, PazinCity of PazinApril 2020.
Footbridge, Brodski StupnikBrodski Stupnik MunicipalityMay 2020.
Residential building (Pr+1) and auxiliary buildings, VodicePrivate investorOctober 2020.
Liquid sulfur tank, KutinaPetrokemija d.d. – Fertilizer factoryOctober 2020.
Wood and wood biomass processing plant, BrinjeBE-TO Brinje d.o.o.December 2020.
Complex of multiple residential buildings area 10.000 m2, VodicePrivate investorDecember 2020.